Westheimer Streetscape Corridor Improvements

Westchase District | Harris County, Texas

Baseline | DCCM managed and performed control surveys, right-of-way surveys, topographic surveys, surveys for resignalization, and surveys for proposed pedestrian walkway easements along 4 miles of Westheimer Road. The project extended from South Kirkwood Road to Gessner Road in the Westchase District of Harris County. The work was performed to assist architectural and civil design for beautification of the corridor and enhancement of pedestrian walkways, intersections, and transit stations. Deliverables included signed and sealed descriptions and surveys for numerous easements, signed and sealed survey control sheets prepared in accordance with TxDOT standards, and topographic surveys for design.

Scroll to Top